EXECUTIVE SUMMARY |
||
Introduction |
4 |
|
Summary of Construction Works undertaken during the Reporting Quarter |
4 |
|
Environmental Monitoring and Audit Works |
4 |
|
Air Quality |
5 |
|
Construction Noise |
5 |
|
Ecological Monitoring |
5 |
|
|
Landscape and Visual Monitoring |
5 |
Environmental Non-Compliance |
5 |
|
Environmental Complaint |
5 |
|
Notification of Summons and Successful Prosecutions |
5 |
|
Future Key Issues |
5-6 |
|
|
|
|
1 |
INTRODUCTION |
|
Purpose of the report |
7 |
|
Structure of the report |
7 |
|
|
|
|
2 |
PROJECT INFORMATION |
|
Background |
8 |
|
Project Organization |
8-9 |
|
Summary of Construction Works Undertaken During Reporting Quarter |
9 |
|
Status of Environmental Licences, Notifications and Permits |
9 |
|
Summary of EM&A Requirement |
10 |
|
|
|
|
3 |
ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENT |
|
Monitoring Parameters and Monitoring Locations |
11-12 |
|
Monitoring Methodology and Calibration Details |
12 |
|
Environmental Quality Performance Limits (Action and Limit Levels) |
12 |
|
Landscape and visual |
12 |
|
Ecology Monitoring |
12-13 |
|
Site Audit Summary |
13 |
|
Environmental Mitigation Measures |
13 |
|
Status of Waste Management |
13 |
|
|
|
|
4 |
MONITORING RESULTS |
14 |
Weather Conditions |
14 |
|
Air Quality |
14 |
|
Construction Noise |
14-15 |
|
Ecological Monitoring |
15 |
|
|
|
|
|
|
|
5 |
ENVIRONMENTAL SITE INSPECTION |
|
Site Audits |
16 |
|
Implementation Status of Environmental Mitigation Measures |
16 |
|
Solid and Liquid Waste Management Status |
16 |
|
|
|
|
6 |
NON-COMPLIANCE (EXCEEDANCES) OF THE ENVIRONMENTAL |
|
QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS) |
|
|
Summary of Exceedances |
17 |
|
Summary of Environmental Non-Compliance |
17 |
|
Summary of Environmental Complaint |
17 |
|
Summary of Environmental Summon and Successful Prosecution |
17 |
|
|
|
|
7 |
FUTURE KEY ISSUES |
|
Key Issues in the Coming Three Months |
18-19 |
|
|
|
|
8 |
CONCLUSIONS AND RECOMMENDATIONS |
|
Conclusions |
20 |
|
Recommendations |
20-22 |
LIST OF TABLES |
|
Table I |
Summary Table for Events Recorded in the Reporting Quarter |
Table 2.1 |
Key Contacts of the Project |
Table 2.2 |
Status of Environmental Licences, Notifications and Permits |
Table 3.1 |
Location for Air Quality Monitoring Stations |
Table 3.2 |
Impact Air Quality Monitoring Parameters, Frequency and Duration |
Table 3.3 |
Location of Noise Monitoring Stations |
Table 3.4 |
Noise Monitoring Parameters, Duration and Frequency |
Table 4.1 |
Summary of 1-hour TSP Monitoring Result in Reporting Quarter |
Table 4.2 |
Summary of Noise Monitoring Result in Reporting Quarter |
LIST OF FIGURES |
|
Figure 1 |
|
Figure 2 |
|
Figure 3 |
|
LIST OF APPENDICES |
|
Appendix A |
|
Appendix B |
|
Appendix C |
|
Appendix D |
|
Appendix E |
|
Appendix F |
|
Appendix G |
|
Appendix H |
|
Appendix I |
|
Appendix J |
EXECUTIVE
SUMMARY
Introduction
1.
This is
the 1st Quarterly Environmental Monitoring and Audit (EM&A) Report for the
Project of Police Facilities in Kong Nga Po under Environmental Permit No. FEP-01/510/2016.
This report was prepared by Ka Shing Management Consultancy Ltd. (Ka Shing)
under “Service Contract Quotation No. PMB202/8480/2022/A01/A Provision of
Environmental Team consultancy for Design and Construction of Kong Nga Po
Police Training Facilities” (hereinafter called the “Service Contract”). This
report documents the findings of Environmental Monitoring and Audit (EM&A)
work conducted from April to June 2023.
2.
During
the reporting quarterly, the following Works Contracts were undertaken for the
Project of Police Facilities in Kong Nga Po under Environmental Permit No. FEP-01/510/2016:
l Contract No. SSK509 - Design and
Construction of Kong Nga Po Police Training Facilities
Summary of
Construction Works undertaken during the Reporting Quarter
3.
The
major site activities undertaken in the reporting quarter included:
l
Ground
investigation
l
Plate
load test
l
Trial
A.O. Probe test
l
Preparation
for excavation
l
Pre-bored
socketed-H Piling
Environmental
Monitoring and Audit Works
4.
Environmental
monitoring for the Project was performed in accordance with the EM&A Manual
and the monitoring results were checked and reviewed. Site Inspections/Audits
were conducted once per week. The implementation of the environmental
mitigation measures, Event Action Plans and environmental complaint handling
procedures were also checked.
5.
Summary
of the environmental exceedances of the reporting quarter for the Project is
tabulated in Table I.
Table I
Summary Table for Events Recorded in the Reporting Quarter
Environmental
Monitoring |
Parameter |
No.
of Non-Project related Exceedances |
No.
of Exceedance related to the Construction Works of the Contract |
Action
Taken |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
|||
Air Quality |
1-hr TSP |
0 |
0 |
0 |
0 |
N/A |
Noise |
Leq(30min) |
0 |
0 |
0 |
0 |
N/A |
Air Quality
7. All
construction air quality monitoring was conducted as scheduled in the reporting
quarter. No Action/Limit Level exceedance was recorded in the reporting
quarter.
Construction
Noise
8. All
Construction noise monitoring was conducted as scheduled in the reporting
quarter. No Action/Limit Level exceedance was recorded in the reporting
quarter.
Ecological
Monitoring
9. All
ecological monitoring was conducted as scheduled in the reporting quarter. The
ecological monitoring photo records and results were shown in the relevant
Monthly EM&A Reports.
Landscape and
Visual Monitoring
10. Bi-weekly
inspection of the implementation of landscape and visual mitigation measures
was conducted during weekly site audit. Most of the necessary mitigation
measures have been implemented and recommended follow-up actions have been
discharged by the Contractor. Details of the audit findings and implementation
status are summarized in Appendix F and Appendix G.
Environmental
Non-Compliance
11. No environmental non-compliance was
recorded in the reporting quarter.
Environmental
Complaint
12. No
environmental complaint was received in the reporting quarter. The Complaint Log
is presented in Appendix I.
Notification of
Summons and Successful Prosecutions
13. No
notification of summons or successful environmental prosecutions was received
in the reporting quarter.
Future Key
Issues
14. The major site activities for the coming
three months include:
l
Setting-up
of site office
l
Open
cut excavation
l
Removal
of soil
l
Construction
of footings
l
Pre-bored
socketed-H Piling
l
U.U.
Lead in and Pipe Duct Connection
15. Potential
environmental impacts arising from the above construction activities are mainly
associated with construction dust, noise, water quality and waste management.
The anticipated major impacts from the construction works and corresponding
recommended mitigation measures are detailed in Appendix G of Site Audit
Summary.
1 INTRODUCTION
1.1
Ka Shing
Management Consultancy Ltd. (Ka Shing) was commissioned by the Architectural
Services Department (ASD) as the Environmental Team to undertake the
Environmental Monitoring and Audit (EM&A) works for the Project of Police
Facilities in Kong Nga Po under Environmental Permit No. FEP-01/510/2016 to
ensure that the environmental performance of the Works Contracts comply with
the requirements specified in the Environmental Permits (EPs), Environmental
Impact Assessment (EIA) Report and Environmental Monitoring & Audit
(EM&A) Manual of the Police Facilities in Kong Nga Po Project and other
relevant statutory requirements.
Purpose of the
report
1.2
This
is the 1st Quarterly EM&A Report which summarises the impact monitoring
results and audit findings for the EM&A programme during the reporting
period from April to June 2023.
Structure of
the report
1.3
The
structure of the report is as follows:
Section 1: Introduction
- purpose and structure of the report.
Section 2: Project Information – summarises background and scope of the
Project,
site description, project organisation and
contact details, construction programme, the construction works undertaken and
the status of Environmental Permits/Licences during the reporting period.
Section
3: Environmental Monitoring and Audit
Requirement – summarises monitoring location and parameters, monitoring
programmes, monitoring frequencies, Action and Limit Levels, Event / Action
Plans, and Site Audit inspection.
Section 4: Monitoring Result – summarises the
monitoring results in the reporting quarter.
Section 5: Environmental
Site Inspection – summarises the audit findings of the weekly site
inspections undertaken within the reporting period.
Section 6: Non-Compliance of the Environmental Quality Performance Limits
(Action and Limit) – summarises any monitoring exceedance, environmental
complaints, environmental summons and successful prosecutions within the
reporting period.
Section 7: Future
Key Issues – summarises the impact forecast and monitoring schedule for the
next three months.
Section 8: Conclusions and Recommendations
2
PROJECT
INFORMATION
Background
2.1 The
Project mainly includes construction and operation of various police facilities. The
police facilities include:
(i) a helipad;
(ii) two firing ranges;
and
(iii) other facilities,
associated infrastructure & utilities, etc.
2.2 The
Project is a Designated Project under the Environmental Impact Assessment
Ordinance (EIAO). An Environmental Impact Assessment (EIA) Report (Report No.:
AEIAR-201/2016) for the Project was approved under EIAO in October 2016 in
accordance with the EIA Study Brief (No. ESB-276/2014) and the Technical
Memorandum on Environmental Impact Assessment Process (EIAO-TM). The
corresponding Environmental Permit was issued (EP no.: FEP-01/510/2016) by the
Director of Environmental Protection (DEP).
2.3 According to an approved
Environmental Monitoring and Audit (EM&A) Manual, an air quality and noise
monitoring programme is recommended during the construction phases of the
Project to monitor the expected dust and noise nuisances. Baseline air quality
and noise monitoring were conducted by previous ET (Wellab Limited) from 14th
March 2020 to 2nd April 2020 to establish the background conditions of the
designated sensitive receivers prior to the commencement of the Project’s
construction works.
2.4 The site layout plan for the
Project is shown in Figure 1.
Project
Organization
2.5 Different
parties with different levels of involvement in the Project organization under
EP no.: FEP-01/510/2016 include:
Project Proponent – Architectural Services Department
(ArchSD)
Contractor– China State JV
Environmental Team (ET) – Ka Shing Management
Consultancy Ltd.
Independent Environmental Checker (IEC) – Acuity
Sustainability Consulting Limited
2.6 The
key personnel contact names and numbers under Quotation No. PMB202/8480/2022/A01/A
and the other contact names and numbers under ArchSD Contract No. SSK509 are
summarised in Table 2.1.
Table 2.1 Key Contacts of the Project
Party |
Role |
Contact Person |
Phone
No. |
Fax
No. |
Architectural Services Department |
Project Proponent |
Mr. Vincent Kwok |
2867 3939 |
3542 5223 |
Contractor (China State JV) |
Site Agent |
Mr. Kelvin Chan |
6272 8828 |
2866 6325 |
Senior Environmental Officer |
Ms. Marian Kong |
6174 9735 |
2866 6325 |
|
Ka Shing Management Consultancy Ltd. |
ETL |
Mr. W.H. Lee |
2618 2166 |
2120 7752 |
Acuity Sustainability Consulting Limited |
IEC |
Ir. Y.H. Law |
2698 6833 |
2698 9383 |
Summary of
Construction Works Undertaken During Reporting Quarter
2.7 The major site activities
undertaken in the reporting quarterly included:
l
Ground
investigation
l
Plate
load test
l
Trial
A.O. Probe test
l
Preparation
for excavation
l
Pre-bored
socketed-H Piling
Status of
Environmental Licences, Notifications and Permits
2.8 A
summary of the relevant permits, licences, and/or notifications on
environmental protection for this Project is presented in Table 2.2
Table 2.2 Status of Environmental Licences,
Notifications and Permits
Permit
/ Licence No. |
Valid Period |
Status |
|
From |
To |
||
Further Environmental Permit (FEP) |
|||
FEP-01/510/2016 |
N/A |
N/A |
Valid |
Construction Noise Permit (CNP) |
|||
GW-RN0478-23 |
10-05-2023 |
09-08-2023 |
Valid |
Notification pursuant to Air Pollution
Control (Construction Dust) Regulation |
|||
EPD Ref no.: 487864 |
N/A |
N/A |
N/A |
Billing Account for Construction Waste
Disposal |
|||
Account No. 7046289 |
18-01-2023 |
N/A |
Valid |
Registration of Chemical Waste
Producer |
|||
WPN5213-641-C4770-01 |
18-01-2023 |
N/A |
Valid |
Effluent Discharge Licence under Water
Pollution Control Ordinance |
|||
WT00043663-2023 |
21-04-2023 |
30-04-2028 |
Valid |
Summary of
EM&A Requirement
2.9 The
EM&A programme requires construction noise monitoring, air quality
monitoring, ecological monitoring and environmental site audits. The EM&A
requirements are described in the following sections, including:
l
All
monitoring parameters;
l
Action
and Limit levels for all environmental parameters;
l
Event
/ Action Plans;
l
Environmental
mitigation measures, as recommended in the Project EIA study final report; and
l
Environmental
requirements in contract documents.
3
ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENT
Monitoring
Parameters and Monitoring Locations
Air Quality
Monitoring
3.1 In
accordance with the EM&A Manual, impact 1-hour TSP monitoring was conducted
to
monitor the air quality for the Works Contracts. The
location of the monitoring stations are
shown in Figure 2. Table 3.1 describes the
location of the air quality monitoring stations.
Table 3.1 Location for Air Quality Monitoring
Stations
Monitoring
Station |
Location
of Measurement |
AM1 |
Village House, Kong Nga Po |
AM2 |
Village House, Kong Nga Po |
3.2 Table
3.2 Summarises the monitoring parameters and frequencies of impact air
quality monitoring during the Works Contracts activities.
Table
3.2 Impact Air Quality
Monitoring Parameters, Frequency and Duration
Parameters |
Frequency |
1-hr TSP |
Three times/ 6 days |
Noise Monitoring
3.3 In
accordance with the EM&A Manual, construction noise monitoring were
conducted to monitor the construction noise arising from the construction
activities. The location of the monitoring stations are shown in Figure
3.
Table 3.3 describes the location of the noise monitoring stations.
Table 3.3
Location of Noise Monitoring Stations
Monitoring
Station |
Location
of Measurement |
NM9 |
Village House, Kong Nga Po |
NM10 |
Village House, Kong Nga Po |
NM11 |
Village House, Kong Nga Po |
NM12 |
Village House, Kong Nga Po |
NM13 |
Village House, Kong Nga Po |
NM14 |
Village House, near Man Kam To Road |
3.4 Table
3.4 Summarises the monitoring parameters and frequencies of construction
noise monitoring during the Works Contracts activities.
Table
3.4 Noise Monitoring
Parameters, Duration and Frequency
Monitoring
Stations |
Parameter |
Duration |
Frequency |
Measurement |
NM9 |
L10(30 min.) dB(A)[2] |
0700-1900 hrs on normal weekdays |
Once per week |
Free field[1] |
NM10 |
Free field[1] |
|||
NM11 |
Façade |
|||
NM12 |
Façade |
|||
NM13 |
Free field[1] |
|||
NM14 |
Free field[1] |
Remarks:
[1]: Correction of +3dB (A) for Free-field Measurement.
[2]: A-weighted equivalent continuous sound pressure level (Leq). It is
the constant noise level which, under a given situation and time period,
contains the same acoustic energy as the actual time-varying noise level.
L10 is the level exceeded for 10% of the time. For 10% of the time, the
sound or noise has a sound pressure level above L10.
L90 is the level exceeded for 90% of the time. For 90% of the time, the
noise level is above this level.
Monitoring
Methodology and Calibration Details
3.5 Monitoring
works/equipment were conducted/calibrated regularly in accordance with the
Project Specific EM&A Manual. Copies of calibration certificates were
attached in the relevant Monthly EM&A Reports.
Environmental
Quality Performance Limits (Action and Limit Levels)
3.6 The
environmental quality performance limit i.e. Action and Limit Levels were
derived from the baseline monitoring results. Should the measured environmental
quality parameters exceed the Action/Limit Levels, the respective action plans
would be implemented. The Action/Limit Levels for each environmental parameter
are given in Appendix A.
Landscape
and visual
3.7 Bi-weekly
inspection of the implementation of landscape and visual mitigation measures
was conducted during weekly site audit. Most of the necessary mitigation
measures have been implemented and recommended follow-up actions have been
discharged by the Contractor. Details of the audit findings and implementation
status are summarized in Appendix F and Appendix
G.
Ecology
Monitoring
3.8 Ecology
monitoring was carried out on a monthly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures for the retained and transplanted individuals of flora species of
conservation interest. Proper erection and maintenance of the temporary
protective fence enclosing the individuals was inspected for the effectiveness.
The ecological monitoring photo records and result could refer to the relevant
Monthly EM&A Reports.
Site
Audit Summary
3.9 Site
audit were carried out on a weekly basis to monitor and audit the timely
implementation of proper environmental management practices and mitigation
measure of this Project. The observations and recommendations made during the
reporting period are summarized in Appendix G.
Environmental
Mitigation Measures
3.10 Relevant
mitigation measures as recommended in the project EIA report have been
stipulated in the Project EM&A Manual for the Contractor to implement. A
summary of the Environmental Mitigation Implementation Schedule (EMIS) is given
in Appendix F.
Status
of Waste Management
3.11 The amount
of wastes generated by the major site activities of this Project during the
reporting quarter is shown in Appendix H.
4
MONITORING RESULTS
Weather Conditions
4.1 The detail of weather conditions for each individual monitoring session could be referred to monthly EM&A reports.
Air
Quality
1-hr TSP Monitoring
4.2 All construction air quality monitoring was conducted as scheduled during the reporting quarter.
4.3 No Action/Limit Level exceedance was recorded in this reporting quarter. A summary of exceedance is attached in Appendix E.
4.4 Table 4.1 summarizes the air quality monitoring results which were extracted from the monthly reports for this Project. The graphical presentation of the air quality monitoring results are shown in Appendix B.
Table 4.1 Summary of 1-hour TSP
Monitoring Result in Reporting Quarter
Reporting Months |
Air Quality
Monitoring Station |
Average |
Range |
Action Level |
Limit Level |
μg/m3 |
μg/m3 |
μg/m3 |
μg/m3 |
||
Apr-23 |
AM1 |
55 |
45 - 61 |
308 |
500 |
AM2 |
59 |
55 - 63 |
311 |
||
May-23 |
AM1 |
54 |
42 - 68 |
308 |
|
AM2 |
63 |
54 - 84 |
311 |
||
Jun-23 |
AM1 |
51 |
42 - 63 |
308 |
|
AM2 |
57 |
43 - 74 |
311 |
Construction Noise
4.5 All
construction noise monitoring was conducted as scheduled in the reporting
quarter.
4.6 No
Action Level exceedance was recorded in this reporting month. No Limit Level
exceedance was recorded. A summary of exceedance is attached in Appendix E.
4.7 Table
4.2 summarizes the noise monitoring results which were extracted from the
monthly reports for this Project. The graphical presentations of the
construction noise monitoring results are shown in Appendix C.
Table 4.2 Summary
of Noise Monitoring Result in Reporting Quarter:
Reporting Months |
Noise Quality
Monitoring Station |
Average |
Range |
Baseline Level
dB(A) |
Limit Level,
dB(A) |
Leq (30
min), dB(A) |
Leq (30
min), dB(A) |
||||
Apr-23 |
NM9 |
60.0 |
55.1 - 63.8 |
55.9 |
75 |
NM10 |
55.5 |
53.8 - 56.4 |
52.8 |
||
NM11 |
48.3 |
42.9 - 51.4 |
46.4 |
||
NM12 |
48.7 |
43.8 - 55.9 |
54.7 |
||
NM13 |
56.9 |
49.2 - 63.1 |
61.3 |
||
NM14 |
50.4 |
48.2 - 54.5 |
59.6 |
||
May-23 |
NM9 |
55.3 |
43.6 - 61.7 |
55.9 |
|
NM10 |
53.5 |
49.3 - 63.2 |
52.8 |
||
NM11 |
49.8 |
46.8 - 52.4 |
46.4 |
||
NM12 |
52.9 |
44.8 - 63.8 |
54.7 |
||
NM13 |
53.3 |
50.3 - 56.4 |
61.3 |
||
NM14 |
49.4 |
42.8 - 52.4 |
59.6 |
||
Jun-23 |
NM9 |
61.1 |
58.9 - 63.4 |
55.9 |
|
NM10 |
52.0 |
50.4 - 54.4 |
52.8 |
||
NM11 |
51.1 |
48.8 - 55.1 |
46.4 |
||
NM12 |
51.2 |
49.6 - 53.4 |
54.7 |
||
NM13 |
53.8 |
51.7 - 55.9 |
61.3 |
||
NM14 |
50.1 |
48.5 - 52.0 |
59.6 |
Ecological
Monitoring
4.8 Monthly
monitoring of flora species of conservation interest were conducted by ET as scheduled
in the reporting quarter. No construction activity and equipment storage were
observed within the receptor site. Temporary protective fence were found
properly erected and maintained for the transplanted species.
4.9 According
to approved transplantation proposal, the post-transplantation monitoring for
transplanted Brainea insignis and Spiranthes sinensis was conducted by
Contractor post-transplantation monitoring on transplanted Brainea insignis and
Spiranthes sinensis was conducted once per month by the Contractor under
Contract No. SSK509 from April to June 2023 during the reporting period.
4.10 The
contractor provided maintenance works including watering, use of mulch and
weeding to allow healthy growth of the transplanted species. The
post-transplantation monitoring records were submitted to ET and IEC for review
and were included in the relevant monthly EM&A Reports for record keeping.
5
ENVIRONMENTAL
SITE INSPECTION
Site Audits
5.1 Site audits
were carried out by ET on weekly basis in the reporting quarter to monitor the
timely implementation of proper environmental management practices and
mitigation measures on the project site. No non-conformance was identified and
the observation and recommendations made in each individual site audit session
in the reporting period are summarized in Appendix G.
Implementation Status of Environmental
Mitigation Measures
5.2 According
to the EIA Report, Environmental Permit and the EM&A Manual of the Project,
the mitigation measures detailed in the documents are recommended to be
implemented during the construction phase. An updated summary of the
Environmental Mitigation Implementation Schedule (EMIS) is provided in Appendix
F.
Solid and Liquid Waste Management Status
5.3 In
accordance with the EM&A Manual, waste management was audited during weekly
site audit to determine if wastes are being managed in accordance with the
Waste Management Plan (WMP) prepared for the Project and the relevant legislative
and contractual requirements. Waste management practice including waste
handling, storage, transportation and disposal were audited.
5.4 The
Contractor is advised to minimize the wastes generated through the recycling or
reusing. All mitigation measures stipulated in the EM&A Manual and waste
management plans shall be fully implemented. The status of implementation of
waste management and reduction measures are summarised in Appendix F.
5.5 Waste generated
from this Project includes inert C&D materials and non-inert C&D
materials. Non-inert C&D materials are made up of general refuse and waste
that cannot be reused or recycled and has to be disposed of at the designated
landfill sites. The amount of wastes generated by the construction works of the
Project during the reporting quarter is shown in Appendix H.
6 NON-COMPLIANCE
(EXCEEDANCES) OF THE ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT
LEVELS)
Summary of Exceedances
6.1 Environmental
monitoring works were performed in the reporting quarter and all monitoring
results were checked and reviewed. A summary of exceedance is attached in
Appendix E.
6.2 No
exceedance of Action/Limit Levels of air quality and construction noise was
recorded in the reporting quarter.
6.3 No Action
Level exceedance for noise monitoring was recorded. No exceedance of Limit
Level of construction noise was recorded in the reporting quarter.
Summary of Environmental Non-Compliance
6.4 No
environmental non-compliance was recorded in the reporting quarter. The
observations and recommendations made in each individual site audit session
were presented in Appendix G.
Summary of Environmental Complaint
6.5 No complaints
related to air quality and no complaint related to construction noise were
received in the reporting quarter. The Cumulative Complaint Log since the
commencement of the Project is attached in Appendix I.
Summary of Environmental Summon and
Successful Prosecution
6.6 There was
no successful environmental prosecution or notification of summons received in
the reporting quarter. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix
J.
7 FUTURE
KEY ISSUES
Key Issues in the Coming Three Months
7.1 The
major construction activities undertaken in the coming three months will
include:
l
Setting-up
of site office
l
Open
cut excavation
l
Removal
of soil
l
Construction
of footings
l
Pre-bored
socketed-H Piling
l
U.U.
Lead in and Pipe Duct Connection
7.2 Potential
environmental impacts arising from the above construction activities are mainly
associated with construction dust, noise, water quality, waste management and
ecology. The proactive Environmental Protection Proforma summarizing the major
site activities, potential environmental impacts and recommended mitigation
measures for the coming months could refer to relevant Monthly EM&A Report.
7.3 Dust can be
generated during construction works and exposed site area in the summer months
and windy weather in the upcoming dry season. To prevent high dust
concentrations during the summer months, the Contractor should pay attention on
the air quality mitigation measures as far as practicable to minimise the dust
impact to the villages which are located adjacent to the Project works. The
Contractor was also reminded to follow the Project Implementation Schedule in
approved EIA report / EM&A Manual to implement appropriate dust control
measure including “Use of regular water spraying (once every 1.25 hours or 8 times
per day) to reduce dust emissions from heavy construction activities (including
ground excavation, earth moving, etc.) at all active works area exposed site
surfaces and unpaved roads, particularly during dry weather and covering 80% of
stockpiling area by impervious sheets and spraying all dusty material with
water immediately prior to any loading transfer operations to keep the dusty
materials wet during material handling at the stockpile areas” as well as the
relevant dust control practices as stipulated in the Air Pollution Control
(Construction Dust) Regulation so that no adverse dust impact arising from the
Project works site.
7.4 In
addition, construction noise is also one of the key environmental issues during
construction of the Project. Noise mitigation measures such as using quiet
plants and noise barriers should be in place, where applicable. In addition,
the Contractor was reminded to frequently check and maintain the acoustic
materials wrapped on noisy part of PME and ensure no gaps between noise
barriers; proactively identify any potential construction noise impact to NSRs
and provide sufficient mitigation measures if necessary; and provide
notification to nearby villagers in Kong Nga Po for potential noisy works at
works area.
7.5 All other
mitigation measures recommended in the Project Implementation Schedule in
approved EIA report / EM&A Manual should be properly implemented and
maintained as far as practicable.
8 CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
8.1 This
Quarterly EM&A Report presents the EM&A work undertaken from April to
June 2023 in accordance with EM&A Manual.
8.2 Environmental
monitoring and audit works were performed in the reporting quarter and all
monitoring results were checked and reviewed.
Air
Quality Monitoring
8.3 Air
Quality monitoring was conducted as scheduled in the reporting quarter. No
Action/Limit Level exceedance was recorded.
Construction
Noise Monitoring
8.4 Construction
Noise monitoring was conducted as scheduled in the reporting quarter. No Limit
Level exceedance was recorded. No exceedance of Limit Level of construction noise was
recorded in the reporting quarter
Environmental
Site inspections
8.5 Environmental
site inspections were conducted as weekly basis in the reporting quarter. No
environmental non-compliance was recorded.
Environmental
Complaint and Successful Prosecution
8.6 No
complaints related to air quality and no complaint related to construction
noise were received in the reporting quarter. No notification of summons or
successful prosecutions was received in the reporting quarter.
Recommendations
8.7 The
mitigation measures recommended in the EIA report and EM&A Manual are
considered effective and efficient in minimizing environmental impacts due to
construction of the project during the reporting quarter. The EM&A
programme implemented by the ET has effectively monitored the environmental
impacts arising from the construction activities and ensure the proper implementation
of mitigation measures.
8.8 The
effectiveness and efficiency of the EM&A programme will be continuously
reviewed. The EM&A programme will be improved if deficiencies of the
existing EM&A programme are identified.
8.9 According
to the environmental audits performed in the reporting quarter, the following
recommendations were provided to remediate any potential impacts due to the
Project:
Air
Quality Impact
l
To
maintain the cover for stockpile of dusty materials and exposed slope for dust suppression;
l
To
enhance the dust suppression measures including watering for the dust
generation works, exposed site area and haul road;
l
To
regular check the valid NRMM labels are properly displayed on the regulated
machines and non-road vehicles; and
l
To maintain
the wheel washing facilities provided at every construction site exit where
practicable are functioning properly.
Construction
Noise Impact
l
To
keep inspect the noise sources inside the site;
l
To
keep space out noisy equipment and position the equipment as far away as
possible from sensitive receivers; and
l
To
maintain temporary noise barriers for operations of noisy equipment near the
noise sensitive receivers, if necessary.
Water
Impact
l
To
maintain the cover for open stockpile of and exposed slope;
l
To
keep reviewing and updating temporary drainage system;
l
To
maintain the earth bunds or sand bag barriers on site to direct stormwater to
silt removal facilities;
l
To
maintain and ensure the silt removal facilities are functioning properly;
l
To
maintain the wheel washing facilities provided at every construction site exit
where practicable are functioning properly; and
l
To
divert the muddy water at the retention pond to the wetsep for treatment before
discharging out.
Waste/Chemical
Management
l
To check
for any accumulation of waste materials or rubbish on site;
l
To
avoid any discharge or accidental spillage of chemical waste or oil directly
from the site;
l
To
maintain the drip tray well to prevent oil and chemical leakage; and
l
To
avoid improper handling, storage and dispose of oil drums or chemical
containers on site.
Ecology
l
To
erect and maintain the protection fence around the retained trees /
conservation species;
l
To
keep the tree protection zone large enough to protect the tress; and
l
To
remove the construction materials within the tree protection zone.
Landscape
and Visual
l
To
erect and maintain the protection fencing and tree protection zone around the
preserved trees;
l
To
remove the construction materials within the tree protection zone; and
l
To
keep the tree protection zone large enough to protect the tress.